Tunnel RunnerComing soon
Built inside a multi-site express tunnel

Checklist software for express tunnel car washes

Teach the job once.It runs that way every morning.

Your attendants get walked through the morning on their phone, one step at a time. You see how it went from your desk — nothing closes on a bad reading, and nothing that goes wrong stays quiet.

Coming soonTry the demo
No contractLive tomorrow morning
6:04
Opening walk
Northside Express
3/9
Tunnel
Gates up and the entrance is clear6:02
E-stops tested at entry, mid and exit6:05
Wrap and mitter condition6:09
Presoak titration
Target 8–12 pts
10.4pts
How it works

Three roles, one way of doing it.

Same shell, three homes. Your attendant sees today. Your manager sees what needs review. You see every site.

01
Attendant

Clock in, pick the site, work today

They see one list, one item open at a time, and a progress bar that moves. Checks, photos, readings and notes — whatever that step actually needs.

Mobile web · nothing to install
02
Manager

Review the day, close the loops

Submitted runs land in a review queue with photos and timestamps. Flags arrive as work orders you can assign, escalate, or use to stop the wash.

Desktop · approve or open
03
Owner

See every site without leaving your desk

Downtime hours and what they cost, completion by person over seven days, and what is about to run out.

Desktop · rollups and reports
Try it

Work the opening walk. Watch it land on the manager's desk.

One card open at a time. Put a bad reading in the titration and you'll see what happens next.

6:01
Opening walk
Northside Express · M. Reyes
0/6
Gates up and the entrance is clear
E-stops tested at entry, mid and exit
Wrap and mitter condition
Photo
Presoak titration
Reading
Vac stalls emptied, hoses intact
Anything the next shift should know
Note
To review
Needs approval 1
Opening walk
Northside Express · M. Reyes · started 6:01 AM
In progress
Nothing submitted yet. Start tapping through the walk on the phone.
For managers and owners

Stop driving between sites to find out what happened.

Downtime, open work orders, completion by person, and what's about to run out — on one screen, every site.

Tunnel Runner
Dashboard
Checklists
Issues3
Downtime1
Supplies
Team2
Reports
Dashboard
All sites+ New
Lakeview Tunnel is down — blower motor, 41 min and countingest. $410 lost
Downtime this month
6.4h
Up 1.2h on last month
Open work orders
3
1 stop-wash, 2 today
7-day completion
94%
Up 11 points since paper
Labor today
$612
Two on shift at Lakeview
Today's checklists
Northside Express — Opening walk100%
Submitted 6:19 AM, waiting on your approval
Northside Express — Mid-shift40%
In progress, M. Reyes
Lakeview Tunnel — Opening walk67%
Started late at 7:42 AM
Lakeview Tunnel — Closing walk0%
Unlocks at 6:00 PM
Needs your review
Presoak titration out of range
Northside Express · #412 · just now
Open
Blower motor down
Lakeview Tunnel · #411 · 41 min
Open
Opening walk submitted
Northside Express · M. Reyes
Approve
Torn wrap photographed
Lakeview Tunnel · #409 · yesterday
Open
Completion by person, 7 days
Green ≥ 90 · purple 85–89 · amber below 85
MRM. Reyes
97%
AOA. Okafor
92%
DTD. Tran
87%
JBJ. Braddock
79%
What's inside

Everything a car wash day actually needs.

Checklists that know their type

A step is a check, a photo, a reading with a range, or a note. Each one asks for exactly what it needs and nothing more.

Photos with a time on them

Every photo carries the moment it was taken and the run it belongs to, so nothing gets recycled from last Tuesday.

Readings with real ranges

Titration, pressure, temperature. Put in a number outside the band and the app prompts before the item can close.

Flag to work order

One tap opens a work order with the reading, the photos and the source item attached. Watch it, today, or stop the wash.

Downtime with a dollar figure

Log what went down, for how long, and why. We turn the hours into lost revenue using your cars-per-hour.

Supplies before you are out

On-hand counts plus burn rate become days-left, and the lot can request what they need without calling you.

Handoff notes that carry

The AM lead writes it, the PM lead reads it, and open issues travel with the shift instead of dying in a text thread.

Completion by person

Seven-day completion per attendant and per site, so coaching is about a number instead of a hunch.

Most-skipped items

If everyone skips the same step every morning, the step is wrong. Reports show you which one and let you fix it in the builder.

Checklist builder

Change it once, it lands everywhere.

Drag the order, set the type, decide whether a flag opens a work order on its own.

Gates up and the entrance is clearCheck
E-stops tested at entry, mid and exitCheck
Wrap and mitter conditionPhoto
Presoak titrationReading 8–12
Anything the next shift should knowNote
+ Add item
Handoff & chemicals

The PM shift knows what the AM shift knew.

Notes carry across, and stock counts turn into days-left before you're out.

MRM. Reyes1:58 PM
Bay 2 mitter cloth is fraying. Tech comes Thursday — run reduced pressure until then. Presoak drum swapped at 11:15 and re-titrated at 10.4.
AOA. OkaforYesterday
Vac 11 suction went soft around 10:40. Changed the bag, still weak. Worth a look.
Presoak concentrate
9 days
Drying agent
3 days
Tire shine
~2 days
Pricing

Pricing is still being set.

Included
Coming soon

We are still working out the plans. Everything below is in the product either way — when the numbers are settled they will be published here first.

Unlimited attendants, managers and owners
Check, photo, reading and note step types
Flags that open work orders with the evidence attached
Downtime logging with estimated lost revenue
Supplies, handoff notes and time clock
Completion reporting by site and by person
A library of checklists from a working tunnel, ready to run or edit
Ask about pricing
Ten sites or more
Let's talk about the portfolio.

Standard templates across every site with room for local variance, rollups by region and manager, single sign-on, and an onboarding path for each site you acquire.

Standard templates across the portfolio with site-level variance
Rollups by region and by manager
Single sign-on and role-based permissions
An onboarding path for every site you acquire
Talk to us
On the phone

Built for one thumb and a wet glove.

Every commit button sits in the bottom third of the screen and every row is at least 56px tall. One card is open at a time, so there's never a question about what to do next. No app store, no install — it opens in the browser they already have.

Any phone browserShared bay deviceDesktop for managers
56pxminimum row and button height, because gloves are not fingertips
1card open at a time — there is never a question about what is next
3homes on the same shell: today, to review, every site
0apps to install. It opens in the browser they already have.
Questions

Straight answers.

Something not covered? Email us — an operator answers.

Tomorrow's opening walk could run itself.

Tell us how many sites you run. We'll send a price and a template set built for express tunnels.

Coming soonTry the demo again
Tunnel Runner
tunnelrunner.comChecklistsTermsPrivacy© 2026ryan@tunnelrunner.com